Cement bulker trailer use steps
Step 1: turn on the battery,fill in the diesel and machinery oil,turn off clutch,keep air inlet valve on,close boost valves and butterfly valve.
Step 2: turn on diesel engine by key
Step 3:one to two minutes later, turn on clutch to connect air compressor and diesel engine
Step 4: tight the screw to adjust the running speed of air compressor to 900-1100
Step 5:turn on boost valve,turn on butterfly valve,star to discharge the cement
Step 6: turn on front boost valve,turn off the back boost to speed up the discharge speed
Step 7:clean the tank
Clean the front part of tank:keep front air inlet valve on,close the back air inlet valve off.
Clean the back part of tank:keep back air inlet valve on,close the front air inlet valve off.
Step 8:turn off the clutch and diesel engine